Raimondi Quick Change Handle for WBS and WBL Sponges - WBHANDLE
Couldn't load pickup availability
                    
                      
Delivery and Shipping
                      
                    
                  
                  Delivery and Shipping
- Orders are shipped via USPS, UPS, or FedEx.
 - Shipping time up to 5 business days. Weekends not included.
 - Express shipping options available.
 - Same-day shipping cut-off time 4:00 PM PST for most items.
 - For oversized shipments that require freight delivery, our team will contact you.
 
                        
                          Description
                          
                        
                      
                      Description
Raimondi Quick Change Handle for WBS and WBL Sponges - WBHANDLE
The rounded shape of the notches reduce the chance of the adhesive binding and ripping away the ridges while using the trowel.
The adhesive does not bind in the rounded corners of this notch leaving the adhesive ridges intact.
Handle for all Wash buckets
Feature;
- Stamped in 22 gauge tempered steel with anti-corrosion treatment
 - Handles are made of polished aluminum electro-welded to the blade with rubber hand-grips fastened by a non-slip screw.
 - Can be used with any of the WBS and WBL models
 - Ergonomic handle designed for comfort and easy use.
 
Specifications
		Weight 10.8oz
		Size 11" x 5" Notch: 1/4"
		Wheel Ø 4"
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

      
      