Raimondi Replacement Sponge for Handle STANDARD Sizes
Delivery and Shipping
Delivery and Shipping
- Orders are shipped via USPS, UPS, or FedEx.
- Shipping time up to 5 business days. Weekends not included.
- Express shipping options available.
- Same-day shipping cut-off time 4:00 PM PST for most items.
- For oversized shipments that require freight delivery, our team will contact you.
Description
Description
Raimondi Replacement Sponge for Handle STANDARD Sizes
Professional replacement grout cleanup sponges designed for Raimondi quick-change hand floats.
These genuine Raimondi replacement sponges are engineered for efficient grout cleanup and tile installation finishing. Available in multiple sponge materials and configurations, each option is designed to provide optimal performance for specific grout types, tile surfaces, and installation requirements.
The quick-change design allows the sponge to snap securely into the float without adhesives or Velcro, making replacement fast and simple while ensuring reliable performance on the jobsite.
Available Sponge Options
- WBSY - Yellow Sweepex Sponge 5" x 11" for sanded and unsanded grout cleanup
- WBSYC - Yellow Sweepex Sponge with cuts 5" x 11" designed for sanded grout applications where slits help collect more grout for faster cleanup
- WBSB - Brown Avana Sponge 5" x 11" designed for abrasive tile surfaces and demanding applications
- WBSEP - White Cellulose Sponge 5" x 11" designed specifically for epoxy grout cleanup
Specifications
- Compatible with Raimondi Quick-Change Handle Systems
- Sponge Size: 5" x 11"
- Overall Size: 5-1/8" x 11-7/8" x 1-3/16"
- Snap-in installation design
- No adhesives or Velcro required
- Approximate sponge life up to 3,500 square feet
Features
- Designed for professional grout cleanup
- Compatible with Raimondi quick-change hand floats
- Available for sanded, unsanded, and epoxy grout applications
- Quick snap-in replacement system
- No Velcro or adhesive attachment required
- Long sponge service life
- Suitable for wall and floor tile installations
- Works with Raimondi grout wash buckets and roller systems
- Helps reduce grout haze and cleanup time
- Professional-grade replacement components
Applications
- Ceramic tile installations
- Porcelain tile installations
- Natural stone tile projects
- Wall tile grouting
- Floor tile grouting
- Sanded grout cleanup
- Unsanded grout cleanup
- Epoxy grout cleanup
- Professional tile installation projects
Choose the Right Sponge
The Yellow Sweepex sponges are excellent for everyday sanded and unsanded grout cleanup. The slotted Yellow Sweepex version is specifically designed to improve cleanup speed with sanded grout. The Brown Avana sponge provides enhanced durability for abrasive tile surfaces, while the White Cellulose sponge is the preferred choice for epoxy grout installations.
Professional Raimondi Performance
Designed to work seamlessly with Raimondi quick-change handle systems and grout wash buckets, these replacement sponges help tile installers achieve faster cleanup, cleaner grout joints, and improved productivity on residential and commercial projects.
Helpful Resources
- Wash Basins Sponge Floats and Sponges Catalog
- Berta Advanced Grout Cleaning Machine Accessories
- Raimondi Tile Tools and Installation Systems Guide
Shop Related Products
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.









