Raimondi Replacement Sponge for Handle STANDARD Sizes
Couldn't load pickup availability
Delivery and Shipping
Delivery and Shipping
- Orders are shipped via USPS, UPS, or FedEx.
- Shipping time up to 5 business days. Weekends not included.
- Express shipping options available.
- Same-day shipping cut-off time 4:00 PM PST for most items.
- For oversized shipments that require freight delivery, our team will contact you.
Description
Description
Raimondi Replacement Sponge for Handle STANDARD Sizes
WBSY - "Sweepex" Replacement Hand Sponge 5"x 11" Yellow - Ideal for Sanded and Un-sanded grout Cleanup
WBSYC - "Sweepex" Replacement Hand Sponge 5"x 11" Yellow with cuts - Ideal for sanded grout, slits grab more sand for faster cleanup.
WBSB - Avana Replacement Hand Sponge 5"x 11" Brown - Ideal for abrasive tile, stronger sponge quality.
WBSEP - Cellulose Replacement Hand Sponge for Epoxy 5"x 11" White - Ideal for all epoxy grout both Sanded and Un-sanded
Size 5 1/8" X 11 7/8" X 1 3/16"
Feature;
- Designed For Sanded and Unsanded grout Cleanup
- For use with Raimondi Quick-Change Handle
- Long Sponge Life - approximately 3,500 sq. ft.
- Snaps Into Place - No velcro or adhesives needed
- Designed for use with Grout Buckets (with rollers)
- Well suited for wall and floor grouting applications and general cleanup
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.









