`
Satisfaction guaranteed. Call us anytime: 1-877-880-TILE (8453).
Cart: 0 items, $0.00

Your shopping cart is empty.

Checkout

Warmup Snow and Ice Melting Cable 51-84 sq ft - WSM

From: $499.00

Description

Warmup Snow and Ice Melting Cable WSM - 51 to 84 sq ft

Available Voltage: 240/480 Volt

for use under Asphalt, Concrete or Pavers

Warmup Snow Melting Cables WSM are uniquely designed for snow melting in parking lots, driveways, pavements, stairs, etc. with total safety. They are suitable for embedding under concrete, asphalt or under pavers. Come with a 10-Year warranty.

CABLE SPACING COVERAGE
Volt Cable length
(ft)
Resistance
(Ω)
Amps Watts 3 pegs 4 pegs 5 pegs
240 209 23.1 10.4 5000 51 67 84
480 209 92.30 5.20 2500 51 67 84

ADVANTAGES

  • 16ft cold lead, single point connection
  • Installation in sand, gravel or on wire mesh.

The WSM (Warmup Snow Melting Cable) is commonly used in concrete pours, asphalt driveways and paved walkways. All Warmup Cables are rated for 208-240-277V applications. Embedded up to 4" deep, they can be laid out as tire-tracks or for full coverage designs

Specifications;

  • Operating voltage - 240V & 480V
  • Output rating - ± 50 W/sq ft
  • Lengths - Range from 84‘ (25m) up to 500’ (152m)
  • Construction - Energy efficient twin-conductor heating cable of 1/4” (6mm)
  • Maximum temperature - 464˚F (240˚C)
  • Cold tail length - 16.4’ (5m)
  • Warranty - 10-Year

Applications

Suitable Coverings - Pavers and related masonry, Asphalt (direct contact or indirect contact), Concrete (not lightweight)

Suitable Base - Crushed gravel base, Sand bed, Insulation sheets

Min. coverage - 2", Max. coverage - 4"

Installation under PAVERS - Cables should be covered with 2" of sand for paver application. Pavers to be maximum 4" thick.

Installation under ASPHALT - Cable will withstand direct asphalt contact for limited time until asphalt cools. For pours hotter than 220F, apply a layer of 2" of sand over the cable prior to laying asphalt. Do not use rollers over 2 Ton. Hand-rolling highly recommended.

Installation under CONCRETE - Ensure the pour is 4" maximum over the cable. Use re-mesh or wire mesh to secure the cable in the middle of the pour for deeper pours. Cable/Mats can be zip tied to mesh and mesh can be raised with bricks or pulled during pour.

WARRANTY & MAINTENANCE - When installed according to the installation manual and proper testing has been performed throughout, the system requires no maintenance for the duration of its warrantied life. The WSM cable is warrantied for 10 years against manufacturer’s defects and is protected by Warmup’s SAFETYnet guarantee.

WarmUp Snow Melting Specifications and installation

WarmUp Snow Melting Questions & Answers

 

Chat with us Chat